Category of water
Clean, grey and contaminated water require different handling. Contamination increases protective controls and the volume of material that must be removed.
Volume and materials affected
The number of rooms, levels and assemblies involved determines equipment needs and drying duration far more than the visible puddle size.
- Concealed cavities take longer than open surfaces
- Multi-level losses require equipment on each level
- Contents work adds inventory and handling time
Access and reconstruction
Difficult access, occupied buildings and the extent of rebuilding after drying all affect the overall scope of a project.